Factories

Project status: Completed

Project Description: The project consists of 5 factories covering an area of 33 hectares. The complex includes production facilities, as well as two administrative buildings, warehouses, truck parking lot, common parking lot, central dining hall and green areas. This factory is currently the largest pipe production complex in Azerbaijan Republic.

Project details:

  • Overall area – 33 ha
  • Area of Steel Pipe Plant – 27.000 m2;
  • Area of polyethylene pipe plant – 33.000 m2;
  • Area of iron production workshop – 13.500 m2;
  • Green areas – 100.000 m2;
  • Area of the parking lot for trucks – 3.000 m2;
  • Area of the car parking lot – 8.000 m2;
  • Area of warehouses, roads and other premises – 15 ha
  • Area of administrative buildings – 8.500m2
  • Area of central dining hall – 2.100m2.

 

The complex includes:

– Steel Pipe Production Plant

– HDPE Pipe Production Plant

– Mechanical Equipment Plant

– Plastic Injection Plant

– Metal Fence Production Plant

 

 

 

Steel Pipe Production Plant

1

HDPE Pipe Production Plant

6

Mechanical Equipment Plant

4

Metal Fence Production Plant

1

Plastic Injection Plant

IMG_1980