Pipe Line construction and Irrigation Project

PADARCHOL IRRIGATION PROJECT

Project Status: Completed

Project Description: 

  • 76 pivot connections;
  • Construction of DN530-1016mm steel pipeline – 48.123 meters;
  • Welding of 3584 steel pipe joints;
  • Construction of OD250mm-OD500mm HDPE pipeline – 43.045 meters;
  • Welding of 3443 HDPE pipe joints;
  • Project duration – 60 days;
  • Quality control SGS (Switzerland);
  • Testing TÜV-SÜD (Germany);
  • Project Commissioning TÜV-SÜD (Germany);